The skate park was built on a school campus and is part of an activity park that also includes a parkour course and a football field.
The design is divided into a bowl section and a street section to meet the needs of both younger and older users. Various types of materials were used in the facility, following the latest trends within skatepark design.

Client: Kävlinge Municipality / Peab
Architect: Pivotech
Year of Construction: 2024
Contractor: ENR
Materials: Concrete (with color pigments), steel, granite, patterned concrete, corten steel
Scope of Work: Construction of the facility

The skate park was built on a school campus that includes a parkour course and a football field.

The design is divided into a bowl section and a street section to meet the needs of both new and more experienced users.

Various types of materials were used in the facility, following the latest trends within skatepark design.

Client: Kävlinge Municipality / Peab
Architect: Pivotech
Year of Construction: 2024
Contractor: ENR
Materials: Concrete (with color pigments), steel, granite, patterned concrete, corten steel
Scope of Work: Construction of the facility

Photos: Silas Cotto

Sloka OY
Y- tunnus: 3507913-4
Adress: Raisiontie 6 E 51
00280 Helsinki, Finland
Phone number: +358 40 630 1898
Operating hours:
Monday- Friday 8:00-17:00 (UTC+03.00)
Sebastian@slokacustomconcrete.com

© 2025 Sloka Custom Concrete Oy. All rights reserved.